Request a collection
of retired IT equipment.
If you know which equipment needs to go, you can request the collection here. You do not need an account or a residual value scan first. A specialist will contact you within one working day to confirm the volume, location and date, and remains your point of contact until the project is complete.
- 01
How it works
- 01RequestCarried out by: Client
You complete the form with an estimate of the number of devices, the types of equipment, the location and your preferred timeframe.
- 02ConfirmationCarried out by: XITAD
A specialist contacts you within one working day to agree the volume, date, data destruction method and any specifics such as loading times. Once our office has confirmed the project, it is linked to your account.
- 03CollectionCarried out by: Logistics partner
Logistics partners collect the equipment on the agreed date. Condition and quantities are recorded at handover; tamper-evident seals and tracking are used where the project requires it.
- 04Data destructionCarried out by: Processing partner
The storage devices are processed in line with NIST SP 800-88, by default at a secure processing facility, or at your site if agreed.
- 05CompletionCarried out by: XITAD
You receive the certificates and the settlement: the proceeds of reusable equipment, less XITAD's fee, or the costs agreed in advance for equipment with no residual value.
- 01
- 02
What you receive
- Collection confirmation
- The agreed date, location and volume.
- Proof of collection
- Condition and quantities at handover.
- Certificate of data erasure or destruction
- At project level or per storage device, depending on the processing method and what has been agreed.
- Settlement
- The proceeds of reusable equipment, less XITAD's fee, or the transport and processing costs agreed in advance.
Once the project is complete, the documents are available in the client portal. Project documents are retained for seven years.
- 03
Costs and settlement
For reusable equipment, collection is free of charge and you receive the proceeds, less XITAD's fee. That fee is usually a percentage of the proceeds; a fixed fee can be agreed instead. For equipment with no residual value, you pay only transport and processing costs, agreed with you in advance.
You choose the route: a residual value estimate and bids first, or collection straight away with settlement after processing, based on the actual count and condition. In that case, the equipment is assessed and settled once it has been received.
- 04
Conditions and restrictions
- Volume
- From around ten devices, a standard collection is scheduled by appointment. For smaller quantities, we arrange shipping or a combined collection in your region.
- Preparation and loading
- The equipment is packed and accessible at the agreed time. You are responsible for loading at collection, unless otherwise agreed in advance (article 7).
- Lease
- Declare leased or financed equipment in advance. It can be processed or returned to its rightful owner, but not sold.
- Data
- You remain responsible for the security of the equipment and the data on it until the handover to the logistics partner. If the data must not leave your premises, please say so in the notes.
Frequently asked questions about collection
What does collection cost?
For reusable equipment, collection is free of charge and you receive the proceeds, less XITAD's fee. For lots with no residual value, we charge only transport and processing costs, always agreed in advance. If a lot contains both, each category is assessed for reuse. If you go for bids first, you know what the lot will fetch before it is collected.
What is the minimum quantity for a collection?
From around ten devices, we schedule a standard collection by appointment. For smaller quantities, we discuss shipping or a combined collection in your region. If the equipment is at several sites, we plan it as one project, with one point of contact and one overview of everything collected.
When and where is the data erased?
By default at a secure processing facility, after transport by logistics partners. If the data must not leave your premises, it is erased on site before anything is loaded; please mention this in your request. Erasure follows NIST SP 800-88, with a certificate at project level or per storage device, depending on the processing method and what has been agreed.
Can I have equipment collected without a valuation first?
Yes. You choose: a residual value estimate first through the IT Residual Value Scan, or collection straight away with settlement after processing, based on the actual count and condition. In that case, the equipment is assessed and settled after collection. You do not need an account or a scan first; a specialist will contact you within one working day to confirm the collection.
A residual value estimate first
If you want to know what the equipment is likely to fetch before it is collected, use the IT Residual Value Scan. You receive an indicative range per category.
Start the IT Residual Value Scan